Steel buildings in Jasper and Pickens County

Garages, barns, shops and carports for land around Jasper, Talking Rock, Tate and Marble Hill, delivered and installed on your site. Here's who handles permits where you live, and what to sort out on a hillside lot before install day.

County seat
Jasper
Permit offices
4
ZIP codes
7

Photo of a finished building in this size and layout

DesignThe Pasture W × L × H44' × 30' × 12' TypeFarm barn Floor area1,320 sq ft
Delivered & installed
By our install crew, on your level site
Frame
14-gauge galvanized steel, 12-gauge upgrade
Certified drawings
For wind and snow, in many locations
Install time
Many go up about 2 to 4 weeks after you order

Metal buildings that fit Pickens County

Most of the county's farm income comes from poultry and livestock, with cattle, horses and hay on smaller places around Talking Rock and Marble Hill. That's barn and equipment-cover country. Closer to Jasper, it's two-car garages and shops.

  • Pasture

    Farm barn
    W × L × H
    44' × 30' × 12'
    Floor area
    1,320 sq ft
    Starting at, installed
    $18,006

    A closed center you can lock, with an open shed on each side for the animals or the equipment.

  • Haymaker

    Tall equipment cover
    W × L × H
    22' × 45' × 12'
    Floor area
    990 sq ft
    Starting at, installed
    $7,545

    Twelve-foot legs and 45 feet of cover for the equipment, the hay or the camper.

  • Homestead

    Two-car garage
    W × L × H
    24' × 30' × 9'
    Floor area
    720 sq ft
    Starting at, installed
    $12,580

    The classic two-car garage, with a side door so you're not opening the big doors every trip.

Every building is made to order, so any of these can change size, doors and colors. Shop all buildings

Permits in Pickens County

The property owner applies for the permit. Which office you call depends on whether your land is inside a city's limits. Check with them before you order; we help you match the building to their answers.

Worth asking here

  • In Big Canoe or Bent Tree, start with the community's own approval for outbuildings, then the county.
  • Ask Planning & Development which permit type a detached garage or barn falls under, and what they need with the application.

For the full list of questions, check your ZIP below or print them with the Site & permit packet.

Who to call

Outside city limits

Pickens County Planning & Development (opens in a new tab)

Permits and inspections for unincorporated Pickens County.

Talking Rock

Town of Talking Rock (opens in a new tab)

The town has its own permit application (PDF).

Nelson

City of Nelson

Nelson sits partly in Cherokee County. Ask city hall which office handles your address.

Links go to each office's own website. Offices and pages change, so confirm with the office before you rely on them.

Getting your site ready

Pickens is where the mountains start: Jasper calls itself the First Mountain City, I-575 ends just south of town, and Sharp Top and Mount Oglethorpe rise in the east of the county. Plenty of lots here sit on a slope or at the end of a long gravel drive.

Two things to settle early. The site needs to be level within 3" across the footprint, so a hillside spot usually means grading or a concrete pad first. And the delivery truck pulls a 30' to 36' trailer, so check tight switchbacks, low branches and soft shoulders on the way in. Tell us about either when you ask for a price.

The full site checklist

Places we cover in Pickens County

Jasper, Talking Rock, Nelson, Tate, Marble Hill, Big Canoe, Bent Tree

ZIP codes

30107, 30139, 30143, 30148, 30175, 30177, 30734

ZIP codes that reach into Pickens County, from US Census data. Some also cover a neighboring county.

Check your address first

Before you pay anything, see whether we install where you live, which county you're in, and what to ask its building department about a permit.

Checked in your browser with US Census data. Your ZIP isn't sent to us unless you ask for a price.

Georgia county permit guides
Install area
Enter a ZIP to see whether we install there.
County
Which county your ZIP is in.
Who to call
The office that issues building permits there.
What to ask
The questions to settle before you order.

Get a price

Send the basics. You'll get a personal reply with your itemized quote and a drawing the same business day.

  1. We review your size, location and wind or snow needs.
  2. We call or email to confirm details and answer questions.
  3. You get an itemized quote and drawing to review.

Prefer to talk now? (770) 828-4626

Or email contact@workenstructures.com

We use your information to prepare your quote and share it only with the partners who build and install it. We never sell it. Privacy policy